Product Details

Model NO. 325-1220mm
Condition New
Transport Package Plastic Film and Wooden Pallet
Specification 325-1220m
HS Code 8477209000
Production Capacity 15sets/Year

oil gas pipeline 3lpe fbe anti-corrosion coating machine in south africa

Product Description

Oil Gas Pipeline 3LPE FBE Anti-Corrosion Coating Machine

Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

Description
3LPE Anticorrosion coating processing line is to make 3-layer PE, 2-layer PE or FBE anti-corrosion coating for kinds of steel pipes.
3-layer PE coating (3LPE coating) consists of the first FBE coating, middle adhesive layer and the outside polyethylene layer.
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

3LPE coating can strengthen the pipeline’s mechanical properties, high electrical resistance, waterproof, wearable, anti-aging.
3PE coating/coated steel pipes are widely used in pipeline systems for the transmission of oil, gas, water and other fluids. They have highly resistance to corrosive from chemicals, moisture, harmful environment etc.
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

The line includes systems of steel pipe transportation, surface disposal, dust catching, pipe heating, electrostatic spraying, coating, water cooling, edge cutting, hydraulic and pneumatic device, detecting and electric controlling system. 

.
Technological processes
Upload pipes→pipes screw conveyor→rust removal of intermediate frequency heating→Epoxy powder coating→outer layer soli quid & polyethylene coating→cooling spray→pipes screw conveyor→grinding pipes, send→unload pipes
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

Main Equipment of 3PE anticorrosion processing
Configuration List

No. Name Set
A. Derusting Equipment                                          
1 Pipe-converying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4  Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1

Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

Question & Answer:
Q1. What is the range of pipe diameter the equipment can produce?
A: Diameter of steel Pipe: 48-219mm,219-1220mm,800-1600mm,1000-2400mm
Q2. What is the sand blasting grade?
A:SA2.5
Q3. What is your anti-corrosion coating standard?
A: It can meet  SY/T0413-2002 ,GB/T23257-2009, German DIN 30670 , DIN 30678 and  coating specification requirements from American Corrosion Association, and DNV . The product pipe fully complies with  SY/T0315-2005 ,CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and Canada, American Corrosion Association standards.
Q4. What is Delivery Time?
A: 2-3monthes after deposit.
Q5. Production output 
A: It is different output capability as different pipe diameter, the Max. is 3 to 8 km/day, and annual processing capacity is 2 million square meters (Φ508 mm).
Q6. Coating thickness: 
A: 80~800um
Q7. To which country did you sell your 3PE equipment?
A. We have produced nearly 50sets 3PE processing line at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.
Q8. After-sales service: 
A:  Warranty period:
Before delivery all the equipment must be trial operated  to confirm the quantity perfectly.
The warranty period is 12 months from the date of pick-up for mechanical part , and 6 months  for the electrical part.
Service:
The seller provides technical services and provides training and guidance to buyer operators.
Our factory
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

Workshop
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

Customer visiting
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

Delivery
Oil Gas Pipeline 3lpe Fbe Anti-Corrosion Coating Machine

 

    Hot Tags: 3PE-Steel-Pipe-Anti-Corrosion-Production-Line 3Layer-PE-Steel-Pipe-Coating-Line 3PE-Steel-Pipe-Anticorrosive-Making-Line 3Layer-PE-Steel-Pipe-Anti-Corrosion-Processing-Line 3Layer-PE-Steel-pipe-production-Line 3PE-Coating-Line

      

    Video Description